Sludge accumulation in the first anaerobic pond at the Alsamra Wastewater Treatment Plant in Jordan has been monitored over a period of years. Homogeneous distribution of sludge over the pond bottom has not been achieved. The maximum amount of sludge has not accumulated near the inlet. This is due to scouring of the settled materials near the pond inlet and outlet by the high jet velocity of the incoming flow. A model has been developed to describe the volume of sludge accumulated (VAS) in the primary anaerobic pond. The model has been derived on the basis of the non-biodegradable materials in the settled sludge. VAS has been described in terms of the mass rates (F) of suspended solids and total BOD5 in the raw wastewater and an accumulated sludge coefficient (KAS).
Skip Nav Destination
Article navigation
Research Article|
June 01 1995
Modelling sludge accumulation in anaerobic wastewater stabilization ponds
Muwaffaq M. Saqqar;
Muwaffaq M. Saqqar
*Jordan Environmental Study Group, P.O. Box 540116AmmanJordan
Search for other works by this author on:
M. B. Pescod
M. B. Pescod
**Department of Civil Engineering, University of Newcastle upon TyneNewcastle NE1 7RUUK
Search for other works by this author on:
Water Sci Technol (1995) 31 (12): 185–190.
Citation
Muwaffaq M. Saqqar, M. B. Pescod; Modelling sludge accumulation in anaerobic wastewater stabilization ponds. Water Sci Technol 1 June 1995; 31 (12): 185–190. doi: https://doi.org/10.2166/wst.1995.0486
Download citation file:
Sign in
Don't already have an account? Register
Client Account
You could not be signed in. Please check your email address / username and password and try again.
Could not validate captcha. Please try again.
eBook
Pay-Per-View Access
$38.00