Bromma sewage treatment plant (STP) is one of three plants in Stockholm. To meet more stringent requirements for nutrient removal the plant has been extended with a final filtration stage. Earlier it has not been possible to operate the plant with nitrification during winter time. Bad settling properties of the activated sludge have led to bulking sludge and high concentrations of BOD and phosphorus in the effluent. With the filter stage it is now possible to reduce the load on the biological stage by by-passing part of the flow directly to the filters. The result has been very promising and it seems that the plant can meet the new demands for nitrogen removal without extension of the aerated volumes.