STP “De Groote Lucht” in the Netherlands had to be upgraded in order to meet the tightened criterion for total nitrogen (10 mg/l N as yearly average). ASTRASAND moving bed biofiltration, has been introduced for post-denitrification. Pilot plant tests were executed in 1996 and it was found that in order to achieve good filter performance with the specific process conditions, an adequate process control system was required. This filter control ensured removal efficiencies of >95% with influent concentrations up to 30 mg/l NO3−N and strongly fluctuating influent flows. The full scale denitrification installation with a capacity of 3,600 m3/h, the first full scale installation of this type used for biological denitrification in Europe, was built in 1998 and started up in 1999. Since the start up, the filter performance is good and the nitrate removal efficiencies are higher than required.
Skip Nav Destination
Article navigation
Research Article|
February 01 2000
Dynamic denitrification of 3,600 m3/h sewage effluent by moving bed biofiltration
J.P. Kramer;
J.P. Kramer
*Astraco Water Engineering, P.O. Box 52, 8560 AB Balk, The Netherlands
Search for other works by this author on:
J.W. Wouters;
J.W. Wouters
*Astraco Water Engineering, P.O. Box 52, 8560 AB Balk, The Netherlands
Search for other works by this author on:
M.P. Noordink;
M.P. Noordink
*Astraco Water Engineering, P.O. Box 52, 8560 AB Balk, The Netherlands
Search for other works by this author on:
D.M. Anink;
D.M. Anink
**Hoogheemraadschap van Delfland, P.O. Box 3061, 2601 DB, Delft, The Netherlands
Search for other works by this author on:
J.M. Janus
J.M. Janus
***DHV Water, P.O. Box 484, 3800 AL Amersfoort, The Netherlands
Search for other works by this author on:
Water Sci Technol (2000) 41 (4-5): 29–33.
Citation
J.P. Kramer, J.W. Wouters, M.P. Noordink, D.M. Anink, J.M. Janus; Dynamic denitrification of 3,600 m3/h sewage effluent by moving bed biofiltration. Water Sci Technol 1 February 2000; 41 (4-5): 29–33. doi: https://doi.org/10.2166/wst.2000.0421
Download citation file:
Sign in
Don't already have an account? Register
Client Account
You could not be signed in. Please check your email address / username and password and try again.
Impact Factor 1.915
CiteScore 3.3 • Q2
13 days submission to first
decision
1,439,880 downloads in 2021