A method to reduce the cycle time of the SBR-process by utilising submerged membranes is described. The time necessary for the sedimentation of the activated sludge and the extraction of the clear-water phase takes up a major part of the entire cycle period within the SBR-process. By using membranes it is possible to start the clear-water extraction already during the reaction time. The time needed for the sedimentation of the activated sludge can be dispensed with altogether. The paper presents the initial results of a semi-technical test plant, with particular emphasis on the fact that the running of the SBR-plant did not lead to any problems with fouling or scaling. In cases of high solids contents, the oxygen input was below par; this, however, did not have any unfavourable impact on the nitrification.
Skip Nav Destination
Article navigation
Research Article|
February 01 2001
Sequencing batch reactor with submerged hollow fibre membranes for the biomass separation
J. Krampe;
J. Krampe
1Institute for Sanitary Engineering, Water Quality and Solid Waste Management, University of Stuttgart, Bandtäle 2, D-70569 Stuttgart, Germany
Search for other works by this author on:
K. Krauth
K. Krauth
1Institute for Sanitary Engineering, Water Quality and Solid Waste Management, University of Stuttgart, Bandtäle 2, D-70569 Stuttgart, Germany
Search for other works by this author on:
Water Sci Technol (2001) 43 (3): 195–199.
Citation
J. Krampe, K. Krauth; Sequencing batch reactor with submerged hollow fibre membranes for the biomass separation. Water Sci Technol 1 February 2001; 43 (3): 195–199. doi: https://doi.org/10.2166/wst.2001.0137
Download citation file:
Sign in
Don't already have an account? Register
Client Account
You could not be signed in. Please check your email address / username and password and try again.
Could not validate captcha. Please try again.
eBook
Pay-Per-View Access
$38.00