At Himmerfjärden wastewater treatment plant, a fluidised bed reactor for nitrogen removal has been operated since 1997. Despite its small footprint, the system enables a far-reaching nitrogen removal. The current nitrate reduction in the reactor is 95%. The reduction of total nitrogen at the wastewater treatment plant is 80-90% at normal operation. The concentration of nitrate in the effluent is easily controlled by changing the dose of carbon. As part of a series of full-scale experiments, the plant has, for the last two years, been operated without denitrification for a couple of months during spring/summer, in order to benefit a favourable N/P-ratio in the recipient and to counteract the growth of nitrogen fixing blue-green algae. When resuming the dosage of carbon, full denitrification was re-established in about two weeks. Important factors to take into consideration when operating the fluidised bed reactor are the abrasive characteristics of the carrier material (sand), the increased concentration of suspended solids in the effluent, and the importance of a suitable N/P-ratio in the influent, as lack of phosphorus might cause an uncontrolled microbiological growth.
Skip Nav Destination
Article navigation
Research Article|
October 01 2004
Six years of operation of a fluidised bed reactor for denitrification
A. Harri;
1Syvab, Himmerfjärdsverket, S-147 92 Grödinge, Sweden (E-mail: jan.bosander@syvab.se)
E-mail: anita.harri@syvab.se
Search for other works by this author on:
J. Bosander
J. Bosander
1Syvab, Himmerfjärdsverket, S-147 92 Grödinge, Sweden (E-mail: jan.bosander@syvab.se)
Search for other works by this author on:
Water Sci Technol (2004) 50 (7): 97–103.
Citation
A. Harri, J. Bosander; Six years of operation of a fluidised bed reactor for denitrification. Water Sci Technol 1 October 2004; 50 (7): 97–103. doi: https://doi.org/10.2166/wst.2004.0426
Download citation file:
Sign in
Don't already have an account? Register
Client Account
You could not be signed in. Please check your email address / username and password and try again.
Impact Factor 2.430
CiteScore 3.4 • Q2
13 days submission to first
decision
1,439,880 downloads in 2021
29
Views
4
Citations