The extension of the Nijmegen wastewater treatment plant for full nitrogen and phosphorus removal is enormously reduced by introducing an innovative energy interaction with an incineration plant. A reduction of the investment costs of 30–40% has been reached. Heating up a part of the primary sedimentation overflow leads to a constant process temperature of 20–25 °C and an advanced biological phosphorus and COD removal.

This content is only available as a PDF.
You do not currently have access to this content.