The biological phosphorus removal process is often implemented at plants by the construction of an anaerobic bio-p tank in front of the traditional N removing plant configuration. However, biological phosphorus removal is also observed in plant configurations constructed only for nitrogen removal and simultaneous or post-precipitation. The operational experience with this “accidental” biological phosphorus removal is often mixed with quite a lot of frustration, as the process seems to come and go and hence behaves quite uncontrollably. The aim of this work is to develop ways of intentionally exploiting the biological phosphorus process by the use of instrumentation, control and automation to reduce the consumption of precipitants. Means to this end are first to calibrate a modified ASM2d model to a full-scale wastewater treatment plant (WWTP), including both biological and chemical phosphorus removal and a model of the sedimentation process. Second, based on the calibrated model a benchmark model is developed and various control strategies for biological phosphorus removal are tested. Experiences and knowledge gained from the strategies presented and discussed in this paper are vital inputs for the full-scale implementation of a control strategy for biological phosphorus removal at Avedøre WWTP, which is described in another paper. The two papers hence show a way to bridge the gap from model to full implementation.
Skip Nav Destination
Article navigation
Research Article|
February 01 2006
Modelling and control strategy testing of biological and chemical phosphorus removal at Avedøre WWTP
P. Ingildsen;
*Krüger A/S, Veolia Water Systems, Gladsaxevej 363, DK-2860 Søborg, Denmark
Search for other works by this author on:
C. Rosen;
C. Rosen
**Department of Industrial Electrical Engineering and Automation, Lund University, Box 118, SE-221 00 Lund, Sweden,
Search for other works by this author on:
K.V. Gernaey;
K.V. Gernaey
**Department of Industrial Electrical Engineering and Automation, Lund University, Box 118, SE-221 00 Lund, Sweden,
Search for other works by this author on:
M.K. Nielsen;
M.K. Nielsen
***Waste Water Control, Kollemosevej 47, DK-2830 Virum, Denmark
Search for other works by this author on:
T. Guildal;
T. Guildal
****Avedøre Wastewater Serv Co, DK-2650 Hvidovre, Denmark
Search for other works by this author on:
B.N. Jacobsen
B.N. Jacobsen
****Avedøre Wastewater Serv Co, DK-2650 Hvidovre, Denmark
Search for other works by this author on:
Water Sci Technol (2006) 53 (4-5): 105–113.
Citation
P. Ingildsen, C. Rosen, K.V. Gernaey, M.K. Nielsen, T. Guildal, B.N. Jacobsen; Modelling and control strategy testing of biological and chemical phosphorus removal at Avedøre WWTP. Water Sci Technol 1 February 2006; 53 (4-5): 105–113. doi: https://doi.org/10.2166/wst.2006.115
Download citation file:
Sign in
Don't already have an account? Register
Client Account
You could not be signed in. Please check your email address / username and password and try again.
Could not validate captcha. Please try again.