Weak or non-existent institutions are often cited as a major constraint facing management of many lake basins in Africa. By their nature lake basins cut across many sectoral and jurisdictional interests and therefore it is always the case that management of the basins is affected by actions within the various sectors and jurisdictions. Because of the complex nature of issues within lake basins, authority over management of lake basins is dispersed among several institutions, with no single institution having overall authority. Under these circumstances, a major challenge in lake basin management is how to ensure effective coordination among the various players. This paper reviews the situation of lake basin management at eight African lake basins and draws important lessons about lake basin management institutions. It is noted that fragmented approaches, lack of coordination across sectors, and lack of monitoring and enforcement are major institutional weaknesses. Also, it is observed that political will and commitment are essential for the management of African lake basins.
Skip Nav Destination
Article navigation
Research Article|
July 01 2007
Effective lake basin management institutions: lessons from African lakes
V.S. Muhandiki;
*Department of Environmental Systems Engineering, Ritsumeikan University, 1-1-1 Noji-Higashi, Kusatsu, Shiga 525-8577, Japan (E-mail: victor@se.ritsumei.ac.jp)
E-mail: victor@se.ritsumei.ac.jp
Search for other works by this author on:
T.J. Ballatore
T.J. Ballatore
**International Lake Environment Committee Foundation, 1091 Oroshimo, Kusatsu, Shiga 525-0001, Japan (E-mail: tom@ilec.or.jp)
Search for other works by this author on:
Water Sci Technol (2007) 56 (1): 189–198.
Citation
V.S. Muhandiki, T.J. Ballatore; Effective lake basin management institutions: lessons from African lakes. Water Sci Technol 1 July 2007; 56 (1): 189–198. doi: https://doi.org/10.2166/wst.2007.451
Download citation file:
Sign in
Don't already have an account? Register
Client Account
You could not be signed in. Please check your email address / username and password and try again.
Impact Factor 1.915
CiteScore 3.3 • Q2
13 days submission to first
decision
1,439,880 downloads in 2021