This paper reports on a statistical review of a water quality monitoring programme aimed at estimating long-term pollutant loads discharged from waterways in and around Melbourne, Australia. Performance of the current programme was evaluated with respect to the required level of uncertainty to meet management objectives. Use of continuously measured turbidity was found to be an effective surrogate measure for estimating TSS, with errors in long-term load estimates of less than 5%. Where routine grab sampling was used instead, errors increased with sampling interval; a 3-day interval was required to maintain errors within 10% of the continuously measured load. For storm event sampling, auto-samplers were found not to be required, if only long-term load estimates are required. The importance of eliminating systematic errors, by ensuring frequent calibration and data verification, was demonstrated.
Skip Nav Destination
Article navigation
Research Article|
December 01 2007
Statistical evaluation and optimisation of stormwater quality monitoring programmes
T.D. Fletcher;
1Department of Civil Engineering (Institute for Sustainable Water Resources), Monash University, Melbourne, 3800 Australia, (E-mail: [email protected])
E-mail: [email protected]
Search for other works by this author on:
A. Deletic
A. Deletic
1Department of Civil Engineering (Institute for Sustainable Water Resources), Monash University, Melbourne, 3800 Australia, (E-mail: [email protected])
Search for other works by this author on:
Water Sci Technol (2007) 56 (12): 1–9.
Citation
T.D. Fletcher, A. Deletic; Statistical evaluation and optimisation of stormwater quality monitoring programmes. Water Sci Technol 1 December 2007; 56 (12): 1–9. doi: https://doi.org/10.2166/wst.2007.744
Download citation file:
Sign in
Don't already have an account? Register
Client Account
You could not be signed in. Please check your email address / username and password and try again.
Could not validate captcha. Please try again.
eBook
Pay-Per-View Access
$38.00