In Taiwan, more than 20% of the major rivers are mildly to heavily polluted by domestic, industrial, and agricultural wastewaters due to the low percentage of sewers connected to wastewater treatment plants. Thus, constructed or engineered wetlands have been adopted as the major alternatives to clean up polluted rivers. Constructed wetlands are also applied as the tertiary wastewater treatment systems for the wastewater polishment to meet water reuse standards with lower operational costs. The studied Kaoping River Rail Bridge Constructed Wetland (KRRBCW) is the largest constructed wetland in Taiwan. It is a multi-function wetland and is used for polluted creek water purification and secondary wastewater polishment before it is discharged into the Kaoping River. Although constructed wetlands are feasible for contaminated water treatment, wetland sediments are usually the sinks for organics and metals. In this study, water and sediment samples were collected from the major wetland basins in KRRBCW. The investigation results show that more than 97% of total coliforms (TC), 55% of biochemical oxygen demand (BOD), and 30% of nutrients [e.g. total nitrogen (TN), total phosphorus (TP)] were removed via the constructed wetland system. However, results from the sediment analyses show that wetland sediments contained high concentrations of metals (e.g. Cu, Fe, Zn, Cr, and Mn), organic contents (sediment oxygen demand = 1.7 to 7.6 g O2/m2 d), and nutrients (up to 18.7 g/kg of TN and 1.22 g/kg of TN). Thus, sediments should be excavated periodically to prevent the release the pollutants into the wetland system and causing the deterioration of wetland water quality. Results of polymerase chain reaction (PCR), denaturing gradient gel electrophoresis (DGGE), and nucleotide sequence analysis reveal that a variation in microbial diversity in the wetland systems was observed. Results from the DGGE analysis indicate that all sediment samples contained significant amounts of microbial ribospecies, which might contribute to the carbon degradation and nitrogen removal. Gradual disappearance of E. coli was also observed along the flow courses through natural attenuation mechanisms.
Skip Nav Destination
Article navigation
Research Article|
November 01 2010
Constructed wetland for water quality improvement: a case study from Taiwan
C. Y. Wu;
C. Y. Wu
1Institute of Environmental Engineering, National Sun Yat-Sen University, Kaohsiung, Chinese Taiwan
Search for other works by this author on:
J. K. Liu;
J. K. Liu
2Department of Biological Science, National Sun Yat-Sen University, Kaohsiung, Chinese Taiwan
Search for other works by this author on:
S. H. Cheng;
S. H. Cheng
2Department of Biological Science, National Sun Yat-Sen University, Kaohsiung, Chinese Taiwan
Search for other works by this author on:
D. E. Surampalli;
D. E. Surampalli
3Department Environmental Studies, University of Kansas, Lawrence, Kansas, USA
Search for other works by this author on:
C. W. Chen;
C. W. Chen
4Department of Marine Environment, National Kaohsiung Marine University, Kaohsiung, Chinese Taiwan
Search for other works by this author on:
C. M. Kao
1Institute of Environmental Engineering, National Sun Yat-Sen University, Kaohsiung, Chinese Taiwan
E-mail: jkao@mail.nsysu.edu.tw
Search for other works by this author on:
Water Sci Technol (2010) 62 (10): 2408–2418.
Citation
C. Y. Wu, J. K. Liu, S. H. Cheng, D. E. Surampalli, C. W. Chen, C. M. Kao; Constructed wetland for water quality improvement: a case study from Taiwan. Water Sci Technol 1 November 2010; 62 (10): 2408–2418. doi: https://doi.org/10.2166/wst.2010.492
Download citation file:
Sign in
Don't already have an account? Register
Client Account
You could not be signed in. Please check your email address / username and password and try again.
Could not validate captcha. Please try again.