This work suggests a procedure to correctly calibrate the parameters of a one-dimensional MBBR dynamic model in nitrification treatment. The study deals with the MBBR configuration with two reactors in series, one for carbon treatment and the other for nitrogen treatment. Because of the influence of the first reactor on the second one, the approach needs a specific calibration strategy. Firstly, a comparison between measured values and simulated ones obtained with default parameters has been carried out. Simulated values of filtered COD, NH4-N and dissolved oxygen are underestimated and nitrates are overestimated compared with observed data. Thus, nitrifying rate and oxygen transfer into the biofilm are overvalued. Secondly, a sensitivity analysis was carried out for parameters and for COD fractionation. It revealed three classes of sensitive parameters: physical, diffusional and kinetic. Then a calibration protocol of the MBBR dynamic model was proposed. It was successfully tested on data recorded at a pilot-scale plant and a calibrated set of values was obtained for four parameters: the maximum biofilm thickness, the detachment rate, the maximum autotrophic growth rate and the oxygen transfer rate.
Skip Nav Destination
Article navigation
Research Article|
April 01 2012
A calibration protocol of a one-dimensional moving bed bioreactor (MBBR) dynamic model for nitrogen removal
U. Barry;
U. Barry
1Irstea, UR MALY, 3 bis quai Chauveau – CP 220, F-69336 Lyon, France
2Civil and Water Engineering Department, Faculty of Sciences and Engineering, Pavillon Adrien-Pouliot, Laval University, Quebec, Canada G1K 7P4
Search for other works by this author on:
J.-M. Choubert;
1Irstea, UR MALY, 3 bis quai Chauveau – CP 220, F-69336 Lyon, France
E-mail: [email protected]
Search for other works by this author on:
J.-P. Canler;
J.-P. Canler
1Irstea, UR MALY, 3 bis quai Chauveau – CP 220, F-69336 Lyon, France
Search for other works by this author on:
A. Héduit;
A. Héduit
3Irstea, UR HBAN, F-92761 Antony, France
Search for other works by this author on:
L. Robin;
L. Robin
4VINCI ENVIRONNEMENT, 89 boulevard F. Roosevelt, 92500 Rueil-Malmaison cedex, France
Search for other works by this author on:
P. Lessard
P. Lessard
2Civil and Water Engineering Department, Faculty of Sciences and Engineering, Pavillon Adrien-Pouliot, Laval University, Quebec, Canada G1K 7P4
Search for other works by this author on:
Water Sci Technol (2012) 65 (7): 1172–1178.
Article history
Received:
August 09 2011
Accepted:
October 26 2011
Citation
U. Barry, J.-M. Choubert, J.-P. Canler, A. Héduit, L. Robin, P. Lessard; A calibration protocol of a one-dimensional moving bed bioreactor (MBBR) dynamic model for nitrogen removal. Water Sci Technol 1 April 2012; 65 (7): 1172–1178. doi: https://doi.org/10.2166/wst.2012.934
Download citation file:
Sign in
Don't already have an account? Register
Client Account
You could not be signed in. Please check your email address / username and password and try again.
Could not validate captcha. Please try again.
eBook
Pay-Per-View Access
$38.00