Construction of the hydroelectric power plant (HPP) ‘Djerdap 1’ formed a backwater effect on the Danube and its tributaries, which had an inevitable influence on groundwater level, causing it to rise and thus creating additional threats to all melioration areas on more than 300 km of the Danube riversides, as well as on the riversides of its tributaries: the Sava (100 km) and the Tisa (60 km). In this paper, the HPP ‘Djerdap 1’ backwater effect on some characteristic melioration areas (34 in all) has been analyzed. In most of these areas intensive agricultural activity has always been present. An assessment of agricultural production damage was carried out by complex hydrodynamic calculations (60 calculation profiles) for different backwater regimes, with the aim to precisely quantify the HPP ‘Djerdap 1’ backwater effect on groundwater piezometric levels. Combining them with complex agroeconomic analyses, the aim is to quantify agricultural production damage and to consider the perspective of melioration area users. This method, which combines two different, but compatible, aspects of the melioration area threat assessment (hydrodynamic and agroeconomic), may present a quality base for further agricultural production threat assessment on all melioration areas on the Danube riversides, with the final aim to consider the economic effects and the importance of its further protection.
Skip Nav Destination
Article navigation
Research Article|
May 24 2014
Evaluation of melioration area damage on the river Danube caused by the hydroelectric power plant ‘Djerdap 1’ backwater
P. Pajic;
1Institute for the Development of Water Resources ‘Jaroslav Cerni’, Jaroslava Cernog. 80, 11000 Belgrade, Serbia
E-mail: [email protected]
Search for other works by this author on:
L. Andjelic;
L. Andjelic
1Institute for the Development of Water Resources ‘Jaroslav Cerni’, Jaroslava Cernog. 80, 11000 Belgrade, Serbia
Search for other works by this author on:
U. Urosevic;
U. Urosevic
2PUC ‘Belgrade waterworks and sewerage’, Deligradska 28, 11000 Belgrade, Serbia
Search for other works by this author on:
D. Polomcic
D. Polomcic
3University of Belgrade, Faculty of Mining and Geology, Djusina 7, 11000 Belgrade, Serbia
Search for other works by this author on:
Water Sci Technol (2014) 70 (2): 376–385.
Article history
Received:
January 23 2014
Accepted:
May 07 2014
Citation
P. Pajic, L. Andjelic, U. Urosevic, D. Polomcic; Evaluation of melioration area damage on the river Danube caused by the hydroelectric power plant ‘Djerdap 1’ backwater. Water Sci Technol 1 July 2014; 70 (2): 376–385. doi: https://doi.org/10.2166/wst.2014.230
Download citation file:
Sign in
Don't already have an account? Register
Client Account
You could not be signed in. Please check your email address / username and password and try again.
Could not validate captcha. Please try again.
eBook
Pay-Per-View Access
$38.00