The performance of a vertical flow constructed wetland for combined sewer overflow treatment (CSO CW) has been evaluated. The full-scale site has been monitored for 3 years for major pollutants and for two load events for a range of micropollutants (metals, metalloids and polycyclic aromatic hydrocarbons (PAHs)). Performance were predominantly high (97% for total suspended solids (TSS), 80% for chemical oxygen demand (COD), 72% for NH4-N), even if several loads were extremely voluminous, pushing the filter to its limits. Two different filter materials (a 4:1 mixture of sand and zeolite and natural pozzolana) showed similar treatment performance. Furthermore, environmental factors were correlated with COD removal efficiency. The greatest influencers of COD removal efficiency were the inlet dissolved COD concentrations and the duration and potential evapotranspiration during inter-event periods. Furthermore, sludge was analysed for quality and a sludge depth map was created. The map, and calculating the changes in sludge volume, helped to understand solid accumulation dynamics.
Skip Nav Destination
Article navigation
Research Article|
March 04 2017
Performance assessment of a vertical flow constructed wetland treating unsettled combined sewer overflow Available to Purchase
T. G. Pálfy;
1IRSTEA Lyon, Freshwater systems, Ecology and Pollution unit, 5 rue de la Doua, CS70077, 69626 Villeurbanne Cedex, France
2University of Lyon, INSA Lyon, DEEP Laboratory, 20 av. A. Einstein, 69621 Villeurbanne Cedex, France
3Epur Nature SAS, 153 av. Marechal Leclerc, 84510 Caumont sur Durance, France
E-mail: [email protected]
Search for other works by this author on:
M. Gerodolle;
M. Gerodolle
1IRSTEA Lyon, Freshwater systems, Ecology and Pollution unit, 5 rue de la Doua, CS70077, 69626 Villeurbanne Cedex, France
Search for other works by this author on:
R. Gourdon;
R. Gourdon
2University of Lyon, INSA Lyon, DEEP Laboratory, 20 av. A. Einstein, 69621 Villeurbanne Cedex, France
Search for other works by this author on:
D. Meyer;
D. Meyer
1IRSTEA Lyon, Freshwater systems, Ecology and Pollution unit, 5 rue de la Doua, CS70077, 69626 Villeurbanne Cedex, France
3Epur Nature SAS, 153 av. Marechal Leclerc, 84510 Caumont sur Durance, France
Search for other works by this author on:
S. Troesch;
S. Troesch
3Epur Nature SAS, 153 av. Marechal Leclerc, 84510 Caumont sur Durance, France
Search for other works by this author on:
P. Molle
P. Molle
1IRSTEA Lyon, Freshwater systems, Ecology and Pollution unit, 5 rue de la Doua, CS70077, 69626 Villeurbanne Cedex, France
Search for other works by this author on:
Water Sci Technol (2017) 75 (11): 2586–2597.
Article history
Received:
November 16 2016
Accepted:
February 15 2017
Citation
T. G. Pálfy, M. Gerodolle, R. Gourdon, D. Meyer, S. Troesch, P. Molle; Performance assessment of a vertical flow constructed wetland treating unsettled combined sewer overflow. Water Sci Technol 15 June 2017; 75 (11): 2586–2597. doi: https://doi.org/10.2166/wst.2017.126
Download citation file:
Sign in
Don't already have an account? Register
Client Account
You could not be signed in. Please check your email address / username and password and try again.
Could not validate captcha. Please try again.
eBook
Pay-Per-View Access
$38.00