Upon the filling of the Seine Centre sewage plant in May 1998, the SIAAP commissioned its first wastewater treatment plant adapted for handling part of the large amounts of rain period surplus water: its flow rate ranges from 2.8 m3/s during dry weather to 12 m3/s in wet weather conditions. Four operational configurations for treating 240,000 m3/day during dry weather, with different quality objectives, and three configurations for treating the rain period surplus water were designed. Immediately upon filling of the plant, however, the operators had to devise innovative configurations for meeting new discharge standards. This paper will aim at demonstrating (considering a major achievement the various aspects of which will be explained) the SIAAP's will to conform in real time, through a dynamic management of its facilities, to the variation of the priorities in the environmental demands, while preserving the quality of the adjacent owners' immediate environment.
Article navigation
Research Article|
July 01 2001
Seine Centre, the new flexible Colombes sewage treatment plant - from theory to practice
C. Paffoni
C. Paffoni
1
Siaap-Syndicat Interdépartemental pour l'Assainissement de l'Agglomération Parisienne, 82, avenue Kléber - 92700 Colombes, France
Search for other works by this author on:
Water Sci Technol (2001) 44 (2-3): 49-56.
Citation
C. Paffoni; Seine Centre, the new flexible Colombes sewage treatment plant - from theory to practice. Water Sci Technol 1 July 2001; 44 (2-3): 49–56. doi: https://doi.org/10.2166/wst.2001.0752
Download citation file:
Close
Citation
C. Paffoni; Seine Centre, the new flexible Colombes sewage treatment plant - from theory to practice. Water Sci Technol 1 July 2001; 44 (2-3): 49–56. doi: https://doi.org/10.2166/wst.2001.0752
Download citation file:
Close
9
Views
0
Citations