The aim of this study is to present criteria to evaluate the resilience of sewer networks related to ground collapse and urban flooding likely to occur in a specific region and then to determine the ranks of the sewer networks resilience of the selected regions to show the applicability of the analytic hierarchy process (AHP) and the Preference Ranking Organization Method for Enriching Evaluations (PROMETHEE II) method. Fourteen evaluation criteria representing resistance, reliability, redundancy, and response and recovery are presented and their weights are estimated by the AHP by asking questionnaires to 10 sewer experts, leading to the result that the sub-criteria of reliability showed the highest importance, followed by the length ratio of good pipelines (under resistance) and adequacy of the flow capacity of the bypass pipelines (under redundancy). Four separate small blocks of drainage areas (total area of 3.57 km2; sewer length of 50.6 km) in Seoul are chosen for the case study. Using appropriate preference functions and thresholds for each evaluation criterion for PROMETHEE II application yields the resilience rankings of four blocks as Block III > Block IV > Block I > Block II. A sensitivity analysis was also carried out by changing the weights.

  • The factors that affect the sewer network resilience were identified and evaluated.

  • 4Rs (Resistance, Reliability, Redundancy, Response and recovery) were considered.

  • The AHP was used to determine the weights of the criteria.

  • PROMETHEE II was used to obtain the final ranking of the sewer network resilience.

  • Sensitivity analysis was carried out by changing the weights.

Graphical Abstract

Graphical Abstract

In the underground space, various underground facilities are buried like spider webs, such as water supply, electricity, communications, gas, district heating, and sewage pipes. Among them, the problem of urban ground collapse caused by damaged sewer pipes has frequently occurred recently. Ground collapse can bring hidden dangers to traffic safety, pedestrian safety, and damage to street lights, gas pipes, and other municipal facilities. The destruction of sewer pipes will cause sewage to be unable to be discharged, collected, and treated normally. If the sewer pipes are damaged, it is difficult to check immediately. Since an abnormal situation can only be known when a direct accident such as a ground collapse occurs, it is very important to manage in advance to avoid large-scale accidents. As a metropolis in South Korea, Seoul often receives reports of ground collapse, of which a relatively large proportion is caused by damaged sewer pipes (Kwak et al. 2019).

Climate change has led to heavy rains, storms, and other full-scale damage in many countries. Seoul is a city with an intense concentration of political, economic, and other urban functions. It is densely populated with a complex network of buildings and underground infrastructure. Flooding in such a city would cause considerable damage, as well as prohibitive costs and restoration time. In recent years, major floods occurred in Seoul in 2010, 2011, 2018 (Kim et al. 2021), and 2022 (CBBC Newsround 2022). The short-term heavy rain caused floods and landslides in buildings and public facilities in Seoul, causing huge property losses and personal casualties. According to the analysis, the causes of floods are not only heavy rainfall exceeding the design capacity of drainage facilities but also surface runoff going to low-lying areas, insufficient flow capacity of sewage pipes, reduced conveyance due to sediment runoff, and backwater, failure to take account of impact of climate change in road design, vulnerable aspects in using land (e.g. underground arcades and housings), inadequate warning/alarm systems, ineffective traffic controls, poor management of vulnerable areas/facilities, and poor restoration systems and disaster follow-up. Therefore, in order to cope with climate change, major cities around the world are working hard to introduce new disaster prevention systems. In order to better cope with extreme weather conditions, Seoul has been directing its focus on the improvement of the system to become better prepared for potential flooding in the city. The officials in Seoul are making efforts to upgrade the design standards for newly installed sewers and pumping station, to implement sewer rehabilitation projects according to the revised master plan on sewer rehabilitation, to replace old pumps into new ones with expanded capacity, and to apply low impact development technologies to reduce the stormwater runoff (Kim 2017; Song et al. 2022). Several investigators (Butler et al. 2014; Casal-Campos et al. 2018; Binesh et al. 2019; Bakhshipour et al. 2021) introduced the concept of reliability, resilience, sustainability in considering water resource management method, improving the capacity issues of an existing integrated urban wastewater system, or examining the effectiveness of implementing BMPs to reduce urban flooding. Butler et al. (2014) illustrated a pyramid structure that is connected between reliability, resilience, and sustainability, in which resilience should be based on reliability and sustainability should be based on resilience. They also insisted, therefore, that disaster-risk reduction should not only focus on reducing the possibility of disasters but also on improving the resilience of the system to disasters such as ground collapse or urban flooding.

Resilience is a hot topic in urbanism today. Critical infrastructure networks such as electric power, water supply, and drainage, natural gas, telecommunications, and transportation provide the services necessary for the continuous operation of society and are the backbone of modern societies. Sun et al. (2020) focused on the resilience analysis of the transportation infrastructure to support planning and design, and to optimize emergency management and restoration schedules. Feofilovs & Romagnoli (2017) applied the probabilistic method to the district heating pipeline network to generate statistical data for the calculation of the resilience of the district heating pipeline network and clarified the resilience of the district heating pipeline network to specific hazards, as well as the possible impact of specific investment schemes to enhance the resilience. In addition, researches on the resilience of other infrastructures such as telecommunications (Bertelli et al. 2018) and electric power systems (Chen et al. 2020) are also under continuous exploration. However, the implementation of resilience concepts in urban drainage and flood management systems has been limited by the lack of guidelines, standards, and suitable quantitative evaluation methods (Mugume & Butler 2017). Juan-García et al. (2017), in their review of the incorporation of resilience theory into urban wastewater system management, pointed out that four key elements of system stressors, resilience properties, resilience metrics, and interventions were identified in resilience assessment. At the same time, it is pointed out that since the concept of resilience was introduced, only a small subset of the work in wastewater research has directly addressed resilience, and the implementation of resilience in wastewater management has been hindered by the lack of consensus in the definition of resilience and the elements of a resilience assessment. In the resilience research of urban stormwater management system, it is based on the background of responding to urban flood events caused by climate change (van Duin et al. 2021; Rentachintala et al. 2022). Valizadeh et al. (2016) considered the three technical aspects of urban hydrological characteristics, hydraulic factors, and network structure characteristics to quantify the technical resilience of stormwater systems to flooding.

Zhang et al. (2022)'s prior study used the four properties of resilience (robustness, rapidity, resourcefulness, and redundancy, 4Rs) presented by Bruneau et al. (2003) to identify 13 resilience indices of sewer networks in response to the urban ground collapse. In order to measure the robustness of the sewer networks in evaluating ground collapse resilience (GCR), the subfactors of the good pipeline length ratio, the percentage of pipelines length that cannot be driven by CCTV, and traffic complexity were considered. Two subfactors were included to measure the redundancy of the sewer network: adequacy of the flow capacity of the bypass pipeline and the treatment capacity of sewage storage facility. To measure rapidity of sewer network restoration, the four subfactors, such as the allowable restoration time, accessibility, department cooperation plan, and training practice according to the restoration plan, were used. Additional four subfactors to measure the resourcefulness affecting the resilience of the sewer network were the resource acquisition plan and mobilization capability, the past expenditure to avoid major accidents, the future budget for restoration, and the technology availability. Then, they used the analytic hierarchy process (AHP) to obtain the weight of sub-criterion through a questionnaire survey of 10 sewer experts. Finally, the quantification result of the resilience index is calculated by the weighted sum method. In this process, the actual values of some indicators of each selected case need to be normalized, such as converting some qualitative indicators into quantitative indicators and then performing weighted sum calculation to obtain quantitative results. The weighted sum model (WSM) is probably the most commonly used approach, especially in single-dimensional problems, but is not suitable for problems that often involve very different types of criteria and variables (Kabir et al. 2014).

Nowadays, multicriteria decision analysis (MCDA) is increasingly used in environmental policy evaluation (Turcksin et al. 2011). MCDA is a valuable tool that can be applied to many complex decisions. It is the most applicable to solving problems that are characterized as a choice of alternatives. It has all the characteristics of a useful decision support tool: it helps us focus on what is important, is logical and consistent, and is easy to use. There are a variety of MCDA methods, including multi-attribute value/utility theory (MAVT/MAUT), simple multi-attribute rating technique (SMART), AHP, Preference Ranking Organization Method for Enriching Evaluations (PROMETHEE), and Elimination and Choice Translating Relation (ELECTRE). Results of PROMETHEE II are known to be consistent, easy to understand, and require less information from decision-makers compared to the AHP (Balali et al. 2014). The PROMETHEE method is a pairwise comparison of decision points based on assessment factors. However, unlike other multicriteria decision-making methods, it defines a preference function consisting of different assessment factors and assigns a relative weight indicating the level of importance of each factor and the internal relations among them (Sharma et al. 2017). Karamouz et al. (2016) used the PROMETHEE method in the evaluation of flood resiliency for wastewater treatment plants in coastal areas, and this general concept for more than one alternative provided a way to better combine subjective and objective data by utilizing the geometric analysis to compare the values of each sub-criteria with the corresponding values of the other alternatives. Carone et al. (2019) evaluated the disaster resilience of local communities by simulating flood experience and processing anonymous survey data collected before and after flooding practice with PROMETHEE. Kessili & Benmamar (2015) used the AHP-PROMETHEE II ranking method to prioritize sewer rehabilitation projects, envisioning helping sewer managers evaluate and prioritize sewer rehabilitation. Yu et al. (2019) used PROMETHEE and Geometric Analysis for Interactive Aid (GAIA) methods to determine the conditional ranking of ageing sewer pipes. Ahn et al. (2020) applied PROMETHEE using the weights determined by the AHP for the selected sewer evaluation items to calculate the rehabilitation priorities. Some researchers tried to combine the AHP and PROMETHEE to further enhance the capabilities of both techniques (Balali et al. 2014). In these combined methods, the AHP has been used to analyse the structure of the decision problem and determine the weights of the criteria, whereas PROMETHEE has been used to obtain a final ranking of the proposed alternatives and to perform sensitivity analyses by changing the weights. The application of the hybrid model of AHP–PROMETHEE is an important tool for multicriteria decision-making (MCDM). So, in this study, an integrated approach combining AHP and PROMETHEE is applied with the following descriptions. Once criteria and sub-criteria of sewer network resilience are defined, weights of them will be obtained by the computation procedure of the AHP via pairwise comparisons. Subsequently, PROMETHEE II is used to evaluate and rank alternatives to the resilience evaluation of four small blocks of selected drainage areas in Seoul. Eventually, the rank of them regarding resilience from the best to worst one has appeared. Sensitivity analysis was conducted by computing ‘stability intervals’ values to assess the general robustness of the ranking.

Furthermore, in particular, in order to more fully consider the influencing factors of sewer network resilience, this paper applies infrastructure resilience as defined by the UK Cabinet Office: the ability of assets, networks, and systems to anticipate, absorb, adapt to, and/or rapidly recover from a disruptive event. In building resilience, the contribution of each of the four components of resistance, reliability, redundancy, response, and recovery (4Rs) needs to be considered. The resistance element of resilience is focused on providing protection. The objective is to prevent damage or disruption by providing the strength or protection to resist the hazard or its primary impact. This element is similar to the concept of robustness in the 4Rs (rapidity, robustness, resourcefulness, and redundancy) of resilience proposed by Bruneau et al. (2003). The reliability component is concerned with ensuring that the infrastructure components are inherently designed to operate under a range of conditions and hence mitigate damage or loss from an event. This element is not included in the 4Rs of resilience proposed by Bruneau et al. (2003). In the study of the reliability measure of a sewer network by Ermolin & Alexeev (2018), it is pointed out that compared with the research dedicated to the reliability problems of water supply systems, the reliability problems of the sewage disposal systems are still uninvestigated. They therefore quantify reliability by using a functional efficiency estimation of tree-like hierarchical structures, which will quantify the relative volume of raw sewage potentially discharged from the sewer network to the environment over some time period resulting from network component failures. However, data on failure rates are difficult to obtain. Moreover, the results obtained through the new questionnaire show that the importance of reliability is relatively large, so it is considered necessary to conduct further research on the quantification of the reliability index of the sewer pipe network to improve the resilience evaluation framework of the sewer network. Conventional hydraulic reliability-based urban drainage design and rehabilitation approaches focus on minimizing the probability of occurrence of hydraulic failures resulting from a given design rainstorm as a basis for determining the flood protection level of a given system. However, in view of emerging threats, it is now recognized that urban drainage systems should be designed not only to be reliable during normal (standard) conditions but also resilient to unexpected (exceptional) loading conditions (Mugume & Butler 2017). Even though Diao (2020) reported that quantitative studies on the resilience of urban drainage systems tend to focus on investigating hydraulic reliability, considering only functional failures such as the occurrence of extreme rainfall or increasing dry weather flows, the reliability problems of the sewage disposal systems are little investigated especially based on the actual operating data of sewer pipe networks, and there is no universally acceptable definition and measure of reliability of sewer network (Ermolin 2001; Jin & Mukherjee 2010; Haghighi & Bakhshipour 2016; Miszta-Kruk 2016; Ermolin & Alexeev 2018). Therefore, this study will supplement the analysis of reliability indicators based on the previous research. When the reliability of the sewer network is considered, the flooding issue cannot be neglected. As for the reliability of flooding (river flooding as well as sewer flooding) in Seoul in this study, we use five evaluation items evaluated by the River Management Division (RMD), such as the ratio of pipelines with insufficient sewer capacity, the length of the replaced or repaired pipelines per person, the pumping capacities at pump stations, the number of pumping stations, and the area of reservoirs. The redundancy element is concerned with the design and capacity of the network or system, which is consistent with the concept of redundancy in the 4Rs of resilience proposed by Bruneau et al. (2003). The response and recovery element aims to enable a fast and effective response to and recovery from disruptive events, which incorporate both the rapidity and resourcefulness elements of the 4Rs of resilience proposed by Bruneau et al. (2003).

In general, the method is presented as a conceptual framework for evaluating the resilience of sewer networks illustrated in Figure 1 along with the following details of criteria/sub-criteria and alternatives as well as the integrated AHP-PROMETHEE II ranking method.
Figure 1

The conceptual framework of the AHP-PROMETHEE II ranking method.

Figure 1

The conceptual framework of the AHP-PROMETHEE II ranking method.

Close modal

Criteria/sub-criteria and alternatives

First of all, these criteria and sub-criteria proposed in this study were finalized after brainstorming by the authors of this study based on existing references combined with considerations about the resilience of the sewer network system in the context of ground collapse and urban flood. This study uses the four components of resilience (resistance, reliability, redundancy, response, and recovery) presented by the Cabinet Office (2011) different from the 4Rs (rapidity, robustness, resourcefulness, and redundancy) of resilience proposed by Bruneau et al. (2003) previously used in the previous study by Zhang et al. (2022). However, the resistance, redundancy, response, and recovery indicators are conceptually consistent with the 4Rs (rapidity, robustness, resourcefulness, and redundancy) proposed by Bruneau et al. (2003). Therefore, the process that was undertaken to determine the sub-criteria of resistance, redundancy, response, and recovery indicators can refer to the previous research of Zhang et al. (2022). In this study, based on the original 13 factors identified by Zhang et al. (2022), a new factor to characterize reliability is added, as demonstrated in Table 1.

Table 1

Criteria and sub-criteria of the evaluation project

Evaluation criteria
Unit(s)Indicator attributes
CriteriaSub-criteria
Resistance A1: Good pipelines length ratio Quantitative 
A2: Percentage of pipelines length that cannot be driven by CCTV Quantitative 
A3: Traffic complexity 10-Point scale Qualitative 
Reliability B1: Ratio of pipelines with insufficient sewer capacity Quantitative 
B2: Length of the replaced or repaired pipelines per person 
B3: Pumping capacities at pump stations 
B4: Number of pumping stations 
B5: Area of reservoirs 
Redundancy C1: Adequacy of the flow capacity of the bypass pipeline Quantitative 
C2: Presence/absence of sewage storage facility (Y/N) Qualitative 
Response and recovery D1: Allowable restoration time 10-Point scale Qualitative 
D2: Accessibility 10-Point scale Qualitative 
D3: Department cooperation plan (Y/N) Qualitative 
D4: Training practice according to the restoration plan (Y/N) Qualitative 
D5: Resource acquisition plan and mobilization capability (Y/N) Qualitative 
D6: Past expenditure to avoid the major accidents 10-Point scale Qualitative 
D7: Future budget for restoration 10-Point scale Qualitative 
D8: Technology availability 10-Point scale Qualitative 
Evaluation criteria
Unit(s)Indicator attributes
CriteriaSub-criteria
Resistance A1: Good pipelines length ratio Quantitative 
A2: Percentage of pipelines length that cannot be driven by CCTV Quantitative 
A3: Traffic complexity 10-Point scale Qualitative 
Reliability B1: Ratio of pipelines with insufficient sewer capacity Quantitative 
B2: Length of the replaced or repaired pipelines per person 
B3: Pumping capacities at pump stations 
B4: Number of pumping stations 
B5: Area of reservoirs 
Redundancy C1: Adequacy of the flow capacity of the bypass pipeline Quantitative 
C2: Presence/absence of sewage storage facility (Y/N) Qualitative 
Response and recovery D1: Allowable restoration time 10-Point scale Qualitative 
D2: Accessibility 10-Point scale Qualitative 
D3: Department cooperation plan (Y/N) Qualitative 
D4: Training practice according to the restoration plan (Y/N) Qualitative 
D5: Resource acquisition plan and mobilization capability (Y/N) Qualitative 
D6: Past expenditure to avoid the major accidents 10-Point scale Qualitative 
D7: Future budget for restoration 10-Point scale Qualitative 
D8: Technology availability 10-Point scale Qualitative 

The flooding in Seoul should be considered from two perspectives: external (river) flooding and internal (sewer) flooding. Recently, this coastal city with a big River Han experienced only urban floodings, but it has ever faced the risk of external flooding since ancient times. South Korea used to suffer damage from floods caused by typhoons and heavy stormwater almost every monsoon season. Seoul metropolis, the capital and largest coastal city in Korea, is threatened by river flooding as well as inland flooding in the rainy season. In order to prevent flooding, 15 dams were installed upstream of the Han River and 23 rainwater reservoirs, and 120 drainage pump stations downstream in the city of Seoul. The burial depth of drainage pump stations and reservoirs deepens as the sewage including rain flows down through a long sewer pipeline. During very heavy storm periods, as gates of the upstream dams are opened in case of need by the direction of the Han River Flood Control Office (HRFCO), the integrated control for the operation of the pumping stations and reservoirs should be conducted by the RMD in Seoul in cooperation with HRFCO. The concept of reliability proposed in this study focuses on dealing with urban flood hazards, but there is a problem of failure rate data availability on the sewer pipe network, which often occurs in most underground infrastructures. In this study, as the water level of the Han River, which affects sewage drainage in the city, changes greatly during the monsoon season depending on the operating conditions of large-scale dams in the upper reaches of the Han River passing through Seoul, consideration of rainwater pumping stations and reservoirs is essential for evaluating the reliability related to urban flooding. In this study, based on the 2030 Master Plan on Sewerage Rehabilitation (Seoul 2018), we quantify the reliability index by considering five evaluation items, such as the ratio of pipelines with insufficient sewer capacity (based on hydraulic modelling results), the length of the replaced or repaired pipelines per person, the pumping capacities at pump stations, the number of pumping stations, and the area of reservoirs. In the 2030 Master Plan on Sewerage Rehabilitation, the results of hydraulic computation conducted by engineering consulting firms were referred to. The pipes with insufficient flow capacity and the pipes with the minimum velocity not up to the standard value were identified and operated carefully with periodic sewer cleaning before the stormy season. In addition, the subdivision criterion of redundancy ‘Treatment capacity of sewage storage facility’ is revised to the ‘presence/absence of sewage storage facility’ in this study, which is sufficient to compare the final resilience evaluation results of each block in the case study, and prevents concerns about overlapping with the indicator belonging to the subdivision criteria of reliability.

The Seoul Metropolitan Government has formulated a basic sewerage rehabilitation plan every 5 years. In the 2030 Master Plan on Sewerage Rehabilitation, the treatment areas were planned based on the 163 drainage districts and 748 small blocks (Seoul 2018), with a total area of approximately 542,742,842 m2 and a total sewer length of 9,932,508 m. Among them, four small blocks (one block selected randomly in each treatment area, however, block I is an area with a recently established deep stormwater storage-drainage facility, so it was intentionally added for the comparison of the resilience results) were selected for resilience evaluation in this study, and their locations are shown in Figure 2, and the relevant information is shown in Table 2.
Table 2

Information about the selected four small blocks

Evaluation areaTreatment areaTotal sewer length (m)Area (m2)No. of sewer pipesBiochemical Oxygen Demand (BOD) loadings of Combined Sewer Overflows (CSOs) (kg/event)Flow of wastewater (m3/s)
Block I Seonam 17,697.36 1,012,440 329 2,361.83 0.24246 
Block II Nanji 7,166.79 290,416 92 367.98 0.03452 
Block III Tancheon 5,350.28 777,822 46 1,734.03 0.04586 
Block IV Jungnang 20,412.79 1,486,727 410 2,352.06 0.13602 
Evaluation areaTreatment areaTotal sewer length (m)Area (m2)No. of sewer pipesBiochemical Oxygen Demand (BOD) loadings of Combined Sewer Overflows (CSOs) (kg/event)Flow of wastewater (m3/s)
Block I Seonam 17,697.36 1,012,440 329 2,361.83 0.24246 
Block II Nanji 7,166.79 290,416 92 367.98 0.03452 
Block III Tancheon 5,350.28 777,822 46 1,734.03 0.04586 
Block IV Jungnang 20,412.79 1,486,727 410 2,352.06 0.13602 
Figure 2

Four small blocks' sewer networks selected for resilience evaluation. (The red circles indicate the locations of water reclamation centres and yellow sections indicate the locations of small blocks of sewer networks selected in this study.) Please refer to the online version of this paper to see this figure in colour: https://dx.doi.org/10.2166/wst.2023.067.

Figure 2

Four small blocks' sewer networks selected for resilience evaluation. (The red circles indicate the locations of water reclamation centres and yellow sections indicate the locations of small blocks of sewer networks selected in this study.) Please refer to the online version of this paper to see this figure in colour: https://dx.doi.org/10.2166/wst.2023.067.

Close modal

Analytic hierarchy process

The AHP was proposed by Satty (1988, 2008). According to the nature of the problem and the overall goal, the AHP decomposes it according to levels, from top to bottom in order of goals, criteria, alternatives, etc. Then, according to people's subjective judgements, they are compared in pairs to get the index weights. The AHP is based on three principles: (1) construction of a hierarchical structure, (2) priority setting, and (3) logical consistency. First, a hierarchical structure is established. The hierarchical structure has at least three levels: the objective at the top, the (sub-) objectives (criteria and sub-criteria) at the intermediate levels, and the considered alternatives at the bottom. Second, a pairwise comparison matrix (n × n) using Saaty's one to nine fundamental scale is established, which is presented in Table 3 (Saaty 2008). The pairwise comparison matrices are determined in terms of which element dominates the other. The result of the pairwise comparisons is summarized in the pairwise comparison matrix (see Equation (1)). Lastly, the consistency index (CI) of decision-makers, as well as the hierarchy, can be evaluated by means of the consistency ratio (CR). If the CR is lower than 10%, a result can be acceptable. Otherwise, the procedure of pairwise comparison must be repeated until the decision is more consistent. This procedure is explained in detail by Saaty (1988).
(1)
where is a representation of the intensity of the decision maker's preference for one over another compared alternative and for all comparisons i, j = 1, 2, ···, n.
Table 3

Saaty's nine-point scale for pairwise comparison (Saaty 2008)

Comparison intensityDefinition
Equally important 
Moderately more important 
Strongly more important 
Very strongly more important 
Extremely more important 
2, 4, 6, 8 Intermediate judgement values 
1/2, 1/3,···,1/9 Reciprocals 
Comparison intensityDefinition
Equally important 
Moderately more important 
Strongly more important 
Very strongly more important 
Extremely more important 
2, 4, 6, 8 Intermediate judgement values 
1/2, 1/3,···,1/9 Reciprocals 

In the AHP, when conducting questionnaires to experts, the results would be more acceptable when confronted with an appropriate size of experts like a range of 10–25 (Dehghani Pour 2016; Koohathongsumrit 2018). Therefore, this study conducted a questionnaire survey on 10 experts. The questionnaire survey was conducted from June 24, 2022 to July 8, 2022. Ten questionnaires were sent to the survey subjects consisting of 10 sewer experts including four university professors, three researchers at the research institute of Public Works Department in Seoul, and three professional engineers at consulting firms by e-mail, and a total of 10 questionnaires were collected and put into analysis.

Preference Ranking Organization Methods for Enrichment Evaluation

PROMETHEE (Preference Ranking Organization Methods for Enrichment Evaluation) was developed by Brans & Vincke (1985) to derive priorities between alternatives using the preference function for each criterion and the concept of preference leaving flow and entering flow based on the outranking concept (Brans & Vincke 1985; Brans et al. 1986). This method is a relatively new set of multi-attribute decision methods. In 1982, PROMETHEE I (partial ranking) and PROMETHEE II (complete ranking) attracted attention from academia at a conference on auxiliary decision-making tools held at Laval University, Canada. Over the next several years, Professor Brans and Mareschal continued to refine and perfect a series of PROMETHEE techniques, including PROMETHEE III (ranking based on intervals) and PROMETHEE IV (continuous case). A series of algorithms such as designation and continuous case were introduced successively. And the visualized GAIA interactive module proposed in 1988 provided a good graphical representation to support this technique (Mareschal & Brans 1988). In the 1990s, the duo further developed two excellent extension methods: PROMETHEE V (segmentation constraints) and PROMETHEE VI (representation of the human brain). These methods have unique application situations, among which PROMETHEE I and PROMETHEE II are still the most widely used classical methods. The procedure of PROMETHEE I and II is explained as follows:

Step 1: Determination of deviations on the basis of pairwise comparisons.

Define a set of alternatives to the multi-attribute decision problem and suppose that represents the evaluation value of the alternative on the considered criterion (). A specific preference function needs to be defined that translates the deviation between the evaluations of two alternatives ( and ) on a particular criterion () into a preference degree ranging from 0 to 1. This preference function is a non-decreasing function of the observed deviation (d) between the evaluations of the alternatives on the considered criterion (), as shown in Equations (2) and (3).
(2)
(3)

Step 2: Application of the preference function corresponding to an index.

Brans & Vincke (1985) proposed six types of preference functions commonly used by decision-makers, which are: usual criterion, U-shape (quasi-criterion), V-shape (criterion with linear preference), level criterion, linear (criterion with linear preference and indifference area), and Gaussian criterion.

Step 3: Calculation of the overall preference index.

The overall preference index can be computed, taking all the criteria into account (see Equation (4)).
(4)
where denotes the weight for each criterion, and . In this study, the AHP is used to determine the weight of each criterion ().
Step 4: Calculation of leaving flow and entering flow.
(5)
(6)
where and denote the leaving and entering flow, respectively, for each alternative.
Step 5: Calculation of net outranking flow.
(7)
where denotes the net flow for each alternative.

Demonstration of the AHP

As the opinions of different members of the sewer expert group are consulted, the geometric mean is calculated to combine the evaluation (as suggested by Saaty (2001)). Table 4 shows the results of the weight distribution.

Table 4

Local weights of resilience indicator 4Rs and global weights of sub-criteria and their rankings

CriteriaLocal weights of criteria (a)Sub-criteriaLocal weights of sub-criteria (b)Global weights of sub-criteria (a * b)Ranking
Resistance 0.3585 A1 (max) 0.6212 0.2227 
A2 (min) 0.2234 0.0801 
A3 (min) 0.1553 0.0557 
Reliability 0.3106 B (min) 1.0000 0.3106 
Redundancy 0.1564 C1 (max) 0.8079 0.1264 
C2 (max) 0.1921 0.0300 
Response and recovery 0.1745 D1 (min) 0.2571 0.0449 
D2 (max) 0.1087 0.0190 11 
D3 (max) 0.0773 0.0135 12 
D4 (max) 0.0568 0.0099 13 
D5 (max) 0.1545 0.0270 
D6 (max) 0.1101 0.0192 10 
D7 (max) 0.1846 0.0322 
D8 (max) 0.0509 0.0089 14 
CriteriaLocal weights of criteria (a)Sub-criteriaLocal weights of sub-criteria (b)Global weights of sub-criteria (a * b)Ranking
Resistance 0.3585 A1 (max) 0.6212 0.2227 
A2 (min) 0.2234 0.0801 
A3 (min) 0.1553 0.0557 
Reliability 0.3106 B (min) 1.0000 0.3106 
Redundancy 0.1564 C1 (max) 0.8079 0.1264 
C2 (max) 0.1921 0.0300 
Response and recovery 0.1745 D1 (min) 0.2571 0.0449 
D2 (max) 0.1087 0.0190 11 
D3 (max) 0.0773 0.0135 12 
D4 (max) 0.0568 0.0099 13 
D5 (max) 0.1545 0.0270 
D6 (max) 0.1101 0.0192 10 
D7 (max) 0.1846 0.0322 
D8 (max) 0.0509 0.0089 14 

The order of the weights of each criterion obtained by Zhang et al. (2022) through the AHP is robustness, rapidity, resourcefulness, and redundancy, whereas the local weight rankings of the reintegrated criteria in this study are resistance, reliability, response and recovery, and redundancy. In addition, the global weight results of the sub-criteria show that the sub-criterion B of reliability is the highest, followed by A1 (good pipelines length ratio), C1 (adequacy of the flow capacity of the bypass pipeline), A2 (percentage of pipelines length that cannot be driven by CCTV), and A3 (traffic complexity). It is found that the sewer experts regard the measures against the urban flooding related to the external river flooding as the most important when the resilience of sewer pipe networks is to be evaluated. It seems because there is a possibility that more damage is foreseen from river flooding than sewer flooding by itself.

Demonstration of PROMETHEE

In this stage, weights and minimum/maximum preferred direction of sub-criteria in Table 4 were prepared to calculate via PROMETHEE. This study selects the sewer networks in four small blocks of drainage area in Seoul, South Korea as the resilience evaluation object. The valuations of the ‘A3 (traffic complexity)’, ‘D1 (allowable restoration time)’, ‘D2 (accessibility)’, ‘D6 (past expenditure to avoid the major accidents)’, ‘D7 (future budget for restoration)’, and ‘D8 (technology availability)’ are difficult to quantify and their valuations are based upon brainstorm sessions and empirical analysis within the evaluators' team. For this purpose, a 10-point qualitative scale ranging from 1 (very low) to 10 (very high) has been applied (refer to Table 5). For the four qualitative criteria ‘C2 (presence/absence of sewage storage facility)’, ‘D3 (department cooperation plan)’, ‘D4 (training practice according to the restoration plan)’, ‘D5 (resource acquisition plan and mobilization capability)’, their valuations were based on empirical analysis and social surveys within the evaluators' team. For the four quantitative criteria ‘A1(good pipelines length ratio)’, ‘A2 (percentage of pipelines length that cannot be driven by CCTV)’, ‘B(reliability)’, ‘C1 (adequacy of the flow capacity of the bypass pipeline)’, their valuations can be obtained directly from the 2030 Master Plan on Sewerage Rehabilitation (Seoul 2018). Among them, the five items considered in determining ‘B(reliability)’ are the ratio of pipelines with insufficient sewer capacity (40 points), the length of the replaced or repaired pipelines per person (15 points), the pumping capacities at pump stations (15 points), the number of pumping stations (15 points), and the area of reservoirs (15 points), which have a total of 100 points. After each item obtains the maximum and minimum values within the evaluation range, the scores will be allocated proportionally, and the comprehensive results are prioritized from the upper score to the lower score.

Table 5

A 10-point scale proposed for some subdivision factors of the evaluation object

10-Point scaleA3: Traffic complexity (number of intersections/ha)D1: Allowable restoration time (days)D2: Accessibility (average buried depth (m))D6: Past expenditure to avoid the major accidents (one million won/km)D7: Future budget for restoration (%)D8: Technology availability (%)
>0.9 >7 days >2.0 <10 10 10 
0.8–0.9 6–7 days 1.8–2.0 10–15 20 20 
0.7–0.8 5–6 days 1.6–1.8 15–20 30 30 
0.6–0.7 4–5 days 1.4–1.6 20–25 40 40 
0.5–0.6 3–4 days 1.2–1.4 25–30 50 50 
0.4–0.5 2–3 days 1.0–1.2 30–35 60 60 
0.3–0.4 1–2 days 0.8–1.0 35–40 70 70 
0.2–0.3 0.5–1 day 0.6–0.8 40–45 80 80 
0.1–0.2 0.25–0.5 day 0.4–0.6 45–50 90 90 
10 <0.1 <0.25 day <0.6 >50 100 100 
10-Point scaleA3: Traffic complexity (number of intersections/ha)D1: Allowable restoration time (days)D2: Accessibility (average buried depth (m))D6: Past expenditure to avoid the major accidents (one million won/km)D7: Future budget for restoration (%)D8: Technology availability (%)
>0.9 >7 days >2.0 <10 10 10 
0.8–0.9 6–7 days 1.8–2.0 10–15 20 20 
0.7–0.8 5–6 days 1.6–1.8 15–20 30 30 
0.6–0.7 4–5 days 1.4–1.6 20–25 40 40 
0.5–0.6 3–4 days 1.2–1.4 25–30 50 50 
0.4–0.5 2–3 days 1.0–1.2 30–35 60 60 
0.3–0.4 1–2 days 0.8–1.0 35–40 70 70 
0.2–0.3 0.5–1 day 0.6–0.8 40–45 80 80 
0.1–0.2 0.25–0.5 day 0.4–0.6 45–50 90 90 
10 <0.1 <0.25 day <0.6 >50 100 100 

The calculation formula is detailed in the notes in Table 6. With this information, the evaluation matrix is constructed.

Table 6

Sample entries of four alternatives in the evaluation project using the PROMETHEE method

CriteriaSub-criteriaAlternative
Block IBlock IIBlock IIIBlock IV
Resistance A1 (max)a 65.38% 52.77% 72.36% 52.78% 
A2 (min)b 2.76% 18.56% 0.00% 1.55% 
A3 (max) 10 
Reliability B (min)c 33.10% 24.52% 10.28% 22.43% 
Redundancy C1 (max)d 84.62% 97.24% 77.64% 97.23% 
C2 (max) 
Response and recovery D1 (min) 
D2 (max) 
D3 (max) 
D4 (max) 
D5 (max) 
D6 (max) 10 
D7 (max)e 
D8 (max)f 
CriteriaSub-criteriaAlternative
Block IBlock IIBlock IIIBlock IV
Resistance A1 (max)a 65.38% 52.77% 72.36% 52.78% 
A2 (min)b 2.76% 18.56% 0.00% 1.55% 
A3 (max) 10 
Reliability B (min)c 33.10% 24.52% 10.28% 22.43% 
Redundancy C1 (max)d 84.62% 97.24% 77.64% 97.23% 
C2 (max) 
Response and recovery D1 (min) 
D2 (max) 
D3 (max) 
D4 (max) 
D5 (max) 
D6 (max) 10 
D7 (max)e 
D8 (max)f 

aGood pipelines length ratio = (length of entire pipelines − length of old defective pipelines)/length of entire pipelines.

bPercentage of pipelines length that cannot be driven by CCTV = length of pipelines that cannot be driven by CCTV/length of entire pipelines.

cB(reliability) is obtained directly from the 2030 Master Plan on Sewerage Rehabilitation (Seoul 2018).

dAdequacy of the flow capacity of the bypass pipeline = length of pipelines with sufficient hydraulic capacity/length of entire pipelines.

eAssuming that the target year of the sewerage rehabilitation plan is 2020, the assurance rate of the future budget for restoration is 90%, 2025 is 80%, and 2030 is 70%. The target year of the sewerage remediation rehabilitation plan of the four alternative blocks in this study is 2025, so the assurance rate of the future budget for restoration is assumed to be 80%.

fIt is assumed that the technical availability of each small block is the same 60% level, due to the fact that in the event of a ground subsidence or flooding accident, the construction must be dominated by manpower and equipment-intensive operations.

Subsequently, for each criterion, a specific preference function is selected and parameter values are defined to compute the degree of preference associated with the best alternative in the pairwise comparison process (Brans & Mareschal 1994). For quantitative assessments, the PROMETHEE guidelines advise applying a linear preference function (V-shape). The V-shape parameter is set within the range of the evaluation index by using the difference between the maximum value and the minimum value of the evaluation index. For qualitative assessments, the usual criterion or the level criterion can be selected. Among them, the preference degree of the traditional level function has only three values of 0, 0.5, and 1. However, some sample data have a large number of qualitative index levels, and the large difference in the number of index levels and the number of preference degrees of the level function can lead to deviations in the results. So, in this case, two more stages are added to the level-type preference function, forming a new preference function-the multi-level preference function, and the preference degrees are divided into five values, 0, 0.25, 0.5, 0.75, and 1. Therefore, the preference functions and thresholds for each evaluation criterion are determined as shown in Table 7.

Table 7

Definition of evaluation criteria

Evaluation criteria
Unit(s)WeightPerformance function
CriteriaSub-criteria
Resistance A1 (max) 0.2227 V-shape:
 
A2 (min) 0.0801 V-shape:
 
A3 (max) 10-Point scale 0.0557 Deformation of level:
 
Reliability B (min) 0.3106 V-shape:
 
Redundancy C1 (max) 0.1264 V-shape:
 
C2 (max) (Y/N) 0.0300 Usual:
 
Response and recovery D1 (min) 10-Point scale 0.0449 Deformation of level: 
D2 (max) 10-Point scale 0.0190 Deformation of level: 
D3 (max) (Y/N) 0.0135 Usual:
 
D4 (max) (Y/N) 0.0099 Usual:
 
D5 (max) (Y/N) 0.0270 Usual:
 
D6 (max) 10-Point scale 0.0192 Deformation of level: 
D7 (max) 10-Point scale 0.0322 Deformation of level: 
D8 (max) 10-Point scale 0.0089 Deformation of level: 
Evaluation criteria
Unit(s)WeightPerformance function
CriteriaSub-criteria
Resistance A1 (max) 0.2227 V-shape:
 
A2 (min) 0.0801 V-shape:
 
A3 (max) 10-Point scale 0.0557 Deformation of level:
 
Reliability B (min) 0.3106 V-shape:
 
Redundancy C1 (max) 0.1264 V-shape:
 
C2 (max) (Y/N) 0.0300 Usual:
 
Response and recovery D1 (min) 10-Point scale 0.0449 Deformation of level: 
D2 (max) 10-Point scale 0.0190 Deformation of level: 
D3 (max) (Y/N) 0.0135 Usual:
 
D4 (max) (Y/N) 0.0099 Usual:
 
D5 (max) (Y/N) 0.0270 Usual:
 
D6 (max) 10-Point scale 0.0192 Deformation of level: 
D7 (max) 10-Point scale 0.0322 Deformation of level: 
D8 (max) 10-Point scale 0.0089 Deformation of level: 

After the determination of the evaluation matrix and the preference functions, the positive (Φ+), negative (Φ) flows, and the net flow (Φ) values obtained from this evaluation are displayed in Table 8.

Table 8

The results of preference index and flow for PROMETHEE II

Block IBlock IIBlock IIIBlock IV
Block I – 0.3073 0.0990 0.1989 
Block II 0.1981 – 0.1456 0.0113 
Block III 0.4158 0.5523 – 0.4198 
Block IV 0.2365 0.1628 0.1550 – 
Leaving flow 0.2017 0.1183 0.4626 0.1848 
Entering flow 0.1215 0.1461 0.0571 0.0900 
Net flow 0.0803 −0.0277 0.4056 0.0948 
Ranking order of resilience index 
Block IBlock IIBlock IIIBlock IV
Block I – 0.3073 0.0990 0.1989 
Block II 0.1981 – 0.1456 0.0113 
Block III 0.4158 0.5523 – 0.4198 
Block IV 0.2365 0.1628 0.1550 – 
Leaving flow 0.2017 0.1183 0.4626 0.1848 
Entering flow 0.1215 0.1461 0.0571 0.0900 
Net flow 0.0803 −0.0277 0.4056 0.0948 
Ranking order of resilience index 

Based on PROMETHEE II (complete ranking), the results relate only to net flows and there is no incomparable situation. From the calculation results, the small blocks of selected drainage areas in Seoul rankings appear in the order of Block III, Block IV, Block I, and Block II. This means that Block III shows best resilience, while Block II shows the worst. So, in the future, when the government formulates the sewer network rehabilitation plan, it can give priority to investing in areas with poor resilience.

Sensitivity analysis

The sensitivity analysis has been performed, and the resulting ‘stability intervals’ values are given in Table 9. For each criterion, a stability interval was computed. It indicates the range in which the weights of that criterion can be modified without affecting the PROMETHEE II complete ranking, provided that the relative weights of other criteria are not modified. From the result of the sensitivity analysis, it is clear that ‘presence/absence of sewage storage facility (C2)’ has the greatest impact on the complete ranking. It shows that if the weight of C2 changes in the range of 0–0.0422, the ranking does not change. The seven sub-criteria of ‘Percentage of pipelines length that cannot be driven by CCTV (A2)’, ‘traffic complexity (A3)’, ‘department cooperation plan (D3)’, ‘training practice according to the restoration plan (D4)’, ‘resource acquisition plan and mobilization capability (D5)’, ‘future budget for restoration (D7)’, and ‘technology availability(D8)’ have the least impact on the complete ranking, and the weight value changes within any range without affecting the ranking result.

Table 9

Stability intervals

Sub-criteriaInitial weightInterval
MinMax
A1: Good pipelines length ratio 0.2227 0.0565 0.2406 
A2: Percentage of pipelines length that cannot be driven by CCTV 0.0801 Infinity 
A3: Traffic complexity 0.0557 Infinity 
B: Reliability 0.3106 0.2828 0.4993 
C1: Adequacy of the flow capacity of the bypass pipeline 0.1264 0.1052 0.2571 
C2: Presence/absence of sewage storage facility 0.0300 0.0422 
D1: Allowable restoration time 0.0449 0.1124 
D2: Accessibility 0.0190 0.3842 
D3: Department cooperation plan 0.0135 Infinity 
D4: Training practice according to the restoration plan 0.0099 Infinity 
D5: Resource acquisition plan and mobilization capability 0.0270 Infinity 
D6: Past expenditure to avoid the major accidents 0.0192 0.0456 
D7: Future budget for restoration 0.0322 Infinity 
D8: Technology availability 0.0089 Infinity 
Sub-criteriaInitial weightInterval
MinMax
A1: Good pipelines length ratio 0.2227 0.0565 0.2406 
A2: Percentage of pipelines length that cannot be driven by CCTV 0.0801 Infinity 
A3: Traffic complexity 0.0557 Infinity 
B: Reliability 0.3106 0.2828 0.4993 
C1: Adequacy of the flow capacity of the bypass pipeline 0.1264 0.1052 0.2571 
C2: Presence/absence of sewage storage facility 0.0300 0.0422 
D1: Allowable restoration time 0.0449 0.1124 
D2: Accessibility 0.0190 0.3842 
D3: Department cooperation plan 0.0135 Infinity 
D4: Training practice according to the restoration plan 0.0099 Infinity 
D5: Resource acquisition plan and mobilization capability 0.0270 Infinity 
D6: Past expenditure to avoid the major accidents 0.0192 0.0456 
D7: Future budget for restoration 0.0322 Infinity 
D8: Technology availability 0.0089 Infinity 

In addition, when the weight values of the factors that have a greater impact on the final ranking change outside the stable interval, the final ranking change results are shown in Table 10. For example, when the reliability weight value is on the left side of the stable interval, the ranking will change from Block III, Block IV, Block I, and Block II when the weight value is in the stable interval to Block II, Block IV, Block I, and Block III, when it is on the right side of the stable interval, it will become Block IV, Block III, Block I, and Block II.

Table 10

Rank changes when weights change outside the stable interval

Sub-criteriaWeight value change rangeRanking
A1: Good pipelines length ratio [0, 0.0564] Block IV > Block III > Block I > Block II 
[0.2407, 1] Block II > Block IV > Block I > Block III 
B: Reliability [0, 0.2827] Block II > Block IV > Block I > Block III 
[0.4994, 1] Block IV> Block III> Block I> Block II 
C1: Adequacy of the flow capacity of the bypass pipeline [0, 0.1051] Block II > Block IV > Block I > Block III 
[0.2572, 0.3535] Block IV> Block III> Block I> Block II 
[0.3536, 0.4135] Block IV> Block III> Block II> Block I 
[0.4136, 0.6026] Block IV> Block II> Block III> Block I 
[0.6027, 1] Block III> Block II > Block IV > Block I 
C2: Presence/absence of sewage storage facility [0.0423, 0.2449] Block II > Block IV > Block I > Block III 
[0.2450, 1] Block I > Block IV > Block II > Block III 
D1: Allowable restoration time [0.1125, 0.4187] Block II > Block IV > Block I > Block III 
[0.4188, 1] Block II > Block III > Block I > Block IV 
D2: Accessibility [0.3843, 0. 7321] Block III > Block IV> Block II > Block I 
[0.7322, 1] Block II > Block IV > Block III > Block I 
D6: Past expenditure to avoid the major accidents [0.0457, 0.2101] Block II > Block IV > Block I > Block III 
[0.2102, 0.2884] Block I > Block IV > Block II > Block III 
[0.2885, 0.4524] Block I > Block IV > Block III > Block II 
[0.4525, 1] Block I > Block III > Block IV > Block II 
Sub-criteriaWeight value change rangeRanking
A1: Good pipelines length ratio [0, 0.0564] Block IV > Block III > Block I > Block II 
[0.2407, 1] Block II > Block IV > Block I > Block III 
B: Reliability [0, 0.2827] Block II > Block IV > Block I > Block III 
[0.4994, 1] Block IV> Block III> Block I> Block II 
C1: Adequacy of the flow capacity of the bypass pipeline [0, 0.1051] Block II > Block IV > Block I > Block III 
[0.2572, 0.3535] Block IV> Block III> Block I> Block II 
[0.3536, 0.4135] Block IV> Block III> Block II> Block I 
[0.4136, 0.6026] Block IV> Block II> Block III> Block I 
[0.6027, 1] Block III> Block II > Block IV > Block I 
C2: Presence/absence of sewage storage facility [0.0423, 0.2449] Block II > Block IV > Block I > Block III 
[0.2450, 1] Block I > Block IV > Block II > Block III 
D1: Allowable restoration time [0.1125, 0.4187] Block II > Block IV > Block I > Block III 
[0.4188, 1] Block II > Block III > Block I > Block IV 
D2: Accessibility [0.3843, 0. 7321] Block III > Block IV> Block II > Block I 
[0.7322, 1] Block II > Block IV > Block III > Block I 
D6: Past expenditure to avoid the major accidents [0.0457, 0.2101] Block II > Block IV > Block I > Block III 
[0.2102, 0.2884] Block I > Block IV > Block II > Block III 
[0.2885, 0.4524] Block I > Block IV > Block III > Block II 
[0.4525, 1] Block I > Block III > Block IV > Block II 

The proposed assessment of sewer network resilience ranking in this study aims to contribute to the rectification of sewer networks and the formulation of disaster prevention policies such as urban flood and ground collapse through the relative resilience ranking calculated by multicriteria decision-making techniques. The AHP method and PROMETHEE family of methods are well-established MCDM techniques. The selection of criteria can also be an important issue in such a selection process, and the case of this research can provide a recommendation for other researchers. That is, by considering the various evaluation issues that affect the resilience of the sewer networks, an integrated approach of AHP and PROMETHEE for evaluating the relative resilience of each small block is proposed.

The research results showed that starting from the four issues considered in the prioritization of resilience and selecting index elements corresponding to resistance, reliability, redundancy, response, and recovery can be selected to better characterize the resilience of the sewer network. After determining the 14 sub-criteria, the AHP was used to obtain the importance ranking of each sub-criterion, among which the importance of the sub-criteria of reliability (B), good pipelines length ratio (A1), and the adequacy of the flow capacity of the bypass pipeline (C1) is relatively high. Based on the complete ranking method of PROMETHEE II, the resilience of the four small blocks in the selected drainage areas in Seoul are Block III, Block IV, Block I, and Block II in order from high to low.

Compared with the previous research by Zhang et al. (2022), this study added the consideration of urban flood from the perspective of ground collapse. Many studies on resilience of sewer networks lack specificity, and this study quantifies the resilience for specific events (ground collapse and urban flood) and allows the comparison of resilience in different regions, urging new investment and improved operations in regions with weak resilience. It will help designers to specify index and quantify the resilience of the sewer networks. In addition, this paper adapts to qualitative indicators with more levels by improving the level-type preference function, which is more in line with the actual situation. The analysis process of using the PROMETHEE method to rank the resilience of the sewer networks is to set the preference function and parameters according to the subjectivity of the evaluators. Therefore, to ensure the reliability of the analysis, it is necessary to continuously collect the opinions of experts to improve the setting of the preference function and parameters.

This work was supported in part by the Chung-Ang University Young Scientist Scholarship in 2022 and in part by the Korea Environment Industry & Technology Institute (KEITI) through the project for developing innovative drinking water and wastewater technologies, which was funded by the Korea Ministry of Environment (MOE) (2020002700015).

All relevant data are included in the paper or its Supplementary Information.

The authors declare there is no conflict.

Ahn
H. S.
,
Yoo
S. Y.
,
Lee
T. H.
&
Park
K. H.
2020
Application of AHP-PROMETHEE to determine areal and linear priorities for sewer rehabilitation projects
.
Journal of the Korean Society of Water and Wastewater
34
,
289
301
.
Bakhshipour
A. E.
,
Dittmer
U.
,
Haghighi
A.
&
Nowak
W.
2021
Toward sustainable urban drainage infrastructure planning: a combined multiobjective optimization and multicriteria decision-making platform
.
Journal of Water Resources Planning and Management
147
,
04021049
.
Balali
V.
,
Zahraie
B.
&
Roozbahani
A.
2014
A comparison of AHP and PROMETHEE family decision making methods for selection of building structural system
.
American Journal of Civil Engineering and Architecture
2
,
149
159
.
Bertelli
S.
,
Giovinazzi
S.
,
Ruiter
R.
,
López-Querol
S.
,
Rossetto
T.
&
Wotherspoon
L.
2018
Resilience of telecommunications networks and services: practical improvements in the data collection in a post-disaster scenario
. In:
QuakeCoRE 2018 Annual Meeting
,
London
.
Brans
J. P.
&
Mareschal
B.
1994
The PROMCALC & GAIA decision support system for multicriteria decision aid
.
Decision Support System
12
,
297
310
.
Brans
J. P.
,
Vincke
P.
&
Mareschal
B.
1986
How to select and how to rank projects: the promethee method
.
European Journal of Operational Research
24
,
228
238
.
Bruneau
M.
,
Chang
S. E.
,
Eguchi
R. T.
,
Lee
G. C.
,
O'Rourke
T. D.
,
Reinhorn
A. M.
,
Shinozuka
M.
,
Tierney
K.
,
Wallace
W. A.
&
von Winterfeldt
D.
2003
A framework to quantitatively assess and enhance the seismic resilience of communities
.
Earthquake Spectra
19
,
733
752
.
Butler
D.
,
Farmani
R.
,
Fu
G.
,
Ward
S.
,
Diao
K.
&
Astaraie-Imani
M.
2014
A new approach to urban water management: safe and sure
.
Procedia Engineering
89
,
347
354
.
Cabinet Office
2011
Keeping the Country Running: Natural Hazards and Infrastructure
.
Improving the UK's Ability to Absorb, Respond to and Recover from Emergencies
.
Carone
M. T.
,
Melchiorri
L.
,
Romagnoli
F.
&
Marincioni
F.
2019
Can a simulated flood experience improve social resilience to disasters?
Professional Geographer
71
,
604
615
.
Casal-Campos
A.
,
Sadr
S. M. K.
,
Fu
G.
&
Butler
D.
2018
Reliable, resilient and sustainable urban drainage systems: an analysis of robustness under deep uncertainty
.
Environmental Science & Technology
52
,
9008
9021
.
CBBC Newsround
.
2022
South Korea's Capital Seoul Hit With Serious Floods
.
Chen
T.
,
Yang
X.
,
Chen
C.
,
Deng
C.
,
Wu
H.
&
Wu
J.
2020
Evaluation for the resilience of distribution network
. In:
2020 5th Asia Conference on Power and Electrical Engineering (ACPEE)
, pp.
2071
2076
.
Dehghani Pour
M.
2016
Re: What is the Appropriate Number of Experts can I Meet with Them for AHP Method in Order to Identify the Weights of Factors? Is There any Standard?
.
Ermolin
Y.
&
Alexeev
M. I.
2018
Reliability measure of a sewer network
.
Water and Ecology
2
(
74
),
51
58
.
Haghighi
A.
&
Bakhshipour
A. E.
2016
Reliability-based layout design of sewage collection systems in flat areas
.
Urban Water Journal
13
,
790
802
.
Jin
Y.
&
Mukherjee
A.
2010
Modeling blockage failures in sewer systems to support maintenance decision making
.
Journal of Performance of Constructed Facilities
24
,
622
633
.
Juan-García
P.
,
Butler
D.
,
Comas
J.
,
Darch
G.
,
Sweetapple
C.
,
Thornton
A.
&
Corominas
L.
2017
Resilience theory incorporated into urban wastewater systems management. State of the art
.
Water Research
115
,
149
161
.
Kabir
G.
,
Sadiq
R.
&
Tesfamariam
S.
2014
A review of multi-criteria decision-making methods for infrastructure management
.
Structure and Infrastructure Engineering
10
,
1176
1210
.
Karamouz
M.
,
Rasoulnia
E.
,
Zahmatkesh
Z.
,
Olyaei
M. A.
&
Baghvand
A.
2016
Uncertainty-based flood resiliency evaluation of wastewater treatment plants
.
Journal of Hydroinformatics
18
,
990
1006
.
Kessili
A.
&
Benmamar
S.
2015
Prioritizing sewer rehabilitation projects using AHP-PROMETHEE II ranking method
.
Water Science and Technology
73
,
283
291
.
Kim
Y. R.
2017
Seoul's Flood Control Policy
. .
Kim
S.
,
Kang
W.
&
Baek
J.
2021
Flood Risk Assessment of Seoul Based on Watershed Characteristics
.
The Seoul Institute
,
Seoul
.
Koohathongsumrit
N.
2018
Re: What is the Appropriate Number of Experts can I Meet with Them for AHP Method in Order to Identify the Weights of Factors? Is There any Standard?
.
Kwak
T. Y.
,
Woo
S. I.
,
Kim
J. Y.
&
Chung
C. K.
2019
Model test assessment of the generation of underground cavities and ground cave-ins by damaged sewer pipes
.
Soils and Foundations
59
,
586
600
.
Mareschal
B.
&
Brans
J. P.
1988
Geometrical representations for MCDA
.
European Journal of Operational Research
34
,
69
77
.
Rentachintala
L. R. N. P.
,
Reddy
M. G. M.
&
Mohapatra
P. K.
2022
Urban stormwater management for sustainable and resilient measures and practices: a review
.
Water Science and Technology
85
,
1120
1140
.
Saaty
T. L.
,
1988
What is the analytic hierarchy process?
In:
Mathematical Models for Decision Support
(
Mitra
G.
,
Greenberg
H. J.
,
Lootsma
F. A.
,
Rijkaert
M. J.
&
Zimmermann
H. J.
eds.).
Springer
,
Berlin, Heidelberg
, pp.
109
121
.
Saaty
T. L.
2001
Decision Making for Leaders: the Analytic Hierarchy Process for Decisions in A Complex World
.
RWS Publications, Pittsburgh, USA
.
Saaty
T. L.
2008
Decision making with the analytic hierarchy process
.
International Journal of Services Sciences
1
,
83
98
.
Seoul
2018
2030 Master Plan on Sewerage Rehabilitation (in Korean)
.
Sharma
A.
,
Kaur
G.
&
Bansal
J.
2017
A comparative analysis of PROMETHEE, AHP and TOPSIS aiding in financial analysis of firm performance
. In
ICITKM
, pp.
145
150
.
Song
K.
,
Kim
M.
,
Kang
H.-M.
,
Ham
E.-K.
,
Noh
J.
,
Khim
J. S.
&
Chon
J.
2022
Stormwater runoff reduction simulation model for urban flood restoration in coastal area
.
Natural Hazards
114
,
2509
2526
.
Sun
W.
,
Bocchini
P.
&
Davison
B. D.
2020
Resilience metrics and measurement methods for transportation infrastructure: the state of the art
.
Sustain. Resilient Infrastructure
5
,
168
199
.
Turcksin
L.
,
Bernardini
A.
&
Macharis
C.
2011
A combined AHP-PROMETHEE approach for selecting the most appropriate policy scenario to stimulate a clean vehicle fleet
.
Procedia – Social and Behavioral Sciences
20
,
954
965
.
Valizadeh
N.
,
Zorn
C. R.
&
Shamseldin
A. Y.
2016
Evaluating the technical resilience of stormwater systems to flooding
. In
Stormwater Conference
.
van Duin
B.
,
Zhu
D. Z.
,
Zhang
W.
,
Muir
R. J.
,
Johnston
C.
,
Kipkie
C.
&
Rivard
G.
2021
Toward more resilient urban stormwater management systems – bridging the Gap from theory to implementation
.
Frontiers in Water
3
,
671059
.
Yu
S.
,
An
H.
,
Kim
H.
&
Park
K.
2019
Assessment of sewer system using PROMETHEE and GAIA methods
.
Desalination Water Treatment
155
,
24
31
.